On Nh living and commutes..
Derek Martin
invalid at pizzashack.org
Fri Apr 23 01:05:01 EDT 2004
On Thu, Apr 22, 2004 at 02:13:31PM -0700, Michael Costolo wrote:
>
> --- Travis Roy <travis at scootz.net> wrote:
> > 3 is going to suck in Mass...
>
> It should be pointed out, however, that the construction on Rt. 3 is
> due to be finished this summer. And as the number of lanes is
> doubling in many places, the traffic situation on 3 is certain to
> improve.
I think the certainty of this is very questionable, unless you're only
talking about marginal amounts. Even with the road widened, there
will still be bottlenecks in some key places. There's also a
possibility that more people will start using the road, leaving the
situation as bad as it ever was.
The biggest problem is that where it intersects with 95/128 (yes
folks, for some distance, these three highways are all the same road),
there is only one lane. Even if they widen this interchange (which I
think will be difficult given the space available and its strange
shape), the traffic on 128 is usually semi-parked, leaving the extra
bandwidth coming into it not terribly useful.
Unless, of course, they're going to also widen 128 from 4 lanes to
7... Not bloody likely.
--
Derek D. Martin http://www.pizzashack.org/ GPG Key ID: 0xDFBEAD02
-=-=-=-=-
Despite the ever-increasing complexities of human society and the advancement
of science and technology, the most perplexing problems that face most people
remain what to eat for lunch today, and who to sleep with tonight.
-=-=-=-=-
This message is posted from an invalid address. Replying to it will result in
undeliverable mail. Sorry for the inconvenience. Thank the spammers.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/pgp-signature
Size: 189 bytes
Desc: not available
Url : http://mail.gnhlug.org/mailman/private/gnhlug-discuss/attachments/20040423/f8e8999b/attachment.bin
More information about the gnhlug-discuss
mailing list